Loving Home Newsletter

Wetland Seasons Park presents sustainable living for the new generation with handover for Phases 1 and 2 in full swing

Sun Hung Kai Properties (SHKP) has meticulously planned and constructed Wetland Lot No. 34 Development (“the Development”), a project in the Wetland Buffer Area in Tin Shui Wai that emphasizes sustainable living in which the community and the environment are balanced in harmony. The Development is committed to establishing a healthy lifestyle for the new generation that combines natural ecology, wellness and smart living. The project is integrated into the stunning environment of the surrounding Wetland Park, demonstrating that development and conservation can coexist harmoniously, and providing green, healthy homes for more than 1,700 families. The Development comprises 20 blocks of 10-storey residential towers, 10 blocks of five-storey villas and 10 houses, offering a total of 1,727 units. The project is being developed across three phases, all named after Wetland Seasons Park. Handover has been completed for Phase 1 and is in progress for Phase 2.

Natural ecology-integrated design, with a focus on health and wellbeing

The façades of Wetland Seasons Park utilise earth tones to blend in seamlessly with the wetland environment, and SHKP has adopted a stepped layout design to ensure that the prevailing winds from the Wetland Park blowing towards Tin Shui Wai Town Centre remain unblocked, flowing in a bottom-up manner. In addition, 6 ventilation breezeways have been provisioned (with a 35-metre-wide main breezeway) to ensure that Tin Shui Wai Town Centre enjoys sufficient natural wind.

Wetland Seasons Park has a distinguished and stylish private residents' clubhouse named Club Seasons1, with an outdoor green area spanning over 210,000 square feet. Sitting against the backdrop of the Wetland Park's natural ecological landscape and accompanied by various types of trees and terrain, the design extends the natural environment of the Wetland Park to the interior garden of the Development. The Development also features the only sky clubhouse in Tin Shui Wai, Sky Club1, where residents can fully enjoy panoramic views of the Wetland Park. Its design accentuates the close bond between the Development and the Wetland Park. Residents can enjoy its facilities and learn about the environmental characteristics of Hong Kong's wetland.

Integrating smart technology into home life

SHKP has provided in-built internet hotspot sockets2 in each unit at Wetland Seasons Park. After connecting to the specified Internet service provider, residents can seamlessly link all their smart household equipment and connect to the Internet. The Smart Community App3 is a mobile app designed specifically for residents to address their day-to-day needs, such as assisting residents to access touchless door control and lift buttons, and to use a variety of resident services, fully experiencing the comfort and convenience of a smart home.

Notes:

1Club Seasons and Sky Club are the residents' clubhouses of the Development. The use or operation of some of the facilities and/or services in the residents’ clubhouses of the Development may be subject to the rules and regulations of the clubhouses and facilities and the consents or licenses from the relevant Government departments, or subject to additional payments. The names of the clubhouse zones and facilities are promotional names that appear in promotional materials only, and will not appear in the Deed of Mutual Covenant, preliminary agreement for sale and purchase, agreement for sale and purchase, assignment or other title documents relating to the residential properties. Please refer to the Sales Brochure for details of the Development. Facilities in the residents' clubhouses and the date of completion thereof are subject to final approval by the Buildings Department, Lands Department and/or other relevant Government departments, and may not be available for immediate use at the time of handover of the residential properties in the Development.

2Fittings, finishes and appliances in the residential properties are subject to the provisions in the agreement for sale and purchase. The Vendor reserves the rights to revise and/or replace the fittings, finishes and appliances stated in this advertisement/promotional material with other fittings, finishes and appliances, subject to the final approval by the relevant Government departments and the provisions in the agreement for sale and purchase. The Vendor undertakes that if appliances of the specified brand name or model number are not installed in the Development, appliances of comparable quality will be installed.

3The services will be provided by the manager of the Development or other contract-engaged third party companies, and are subject to terms and conditions. The manager or contract-engaged third party companies may solely determine the fees, terms of use, operation hours and service period of the managed service or other services, but subject to the terms in the Deed of Mutual Covenant, service contract or other relevant legal documents. The services and/or facilities may not be available for immediate use at the time of handover of the residential properties in the Development. In case of any dispute, the decision of the management company or contract-engaged third party companies shall be final.

4The above image was taken from some height above the vicinity of the Development on 1 September 2020. It has been processed with computerised imaging techniques in order to illustrate the environment, structures and facilities surrounding the Development. The image is for reference only and does not illustrate the final appearance or view of or from the surrounding structures or environment of the Development or the Development or any part thereof. There will be other completed and/or uncompleted buildings and facilities surrounding the Development and the district and surrounding environment, buildings and facilities might change from time to time. The Vendor does not give any offer, representation, undertaking or warranty whatsoever, whether express or implied, as to the view, environment, structures and facilities in the district or surrounding the Development. The Vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby.

5The above image was taken on 20 April 2021. It has been processed with computerized imaging techniques and the facilities, layout, partitions, specifications, measurements, colours, materials, fittings, finishes, appliances, lighting effects, furniture, decorative items, plants, landscaping and other objects shown therein are for reference only and may not appear in or the view may not be seen in or from the Development or its surrounding area. The image is for reference only and shall not constitute or be construed as any offer, representation, undertaking or warranty whatsoever, whether express or implied by the Vendor.

Name of the Phase of the Development: Phase 1 ("Phase 1") of Wetland Lot No.34 Development ("the Development") (Tower 6, Tower 10, Tower 16, Tower 17, Tower 20 to Tower 23, Villa 8 to Villa 11 and House 1 to House 3, House 5 to House 11 of the residential development in Phase 1 are called "Wetland Seasons Park"); Phase 2 ("Phase 2") of the Development (Tower 2, Tower 3, Tower 5, Tower 11, Tower 12, Tower 15, Tower 18 and Tower 19, Villa 1 to Villa 3 and Villa 5 to Villa 7 of the residential development in Phase 2 are called "Wetland Seasons Park"); Phase 3 ("Phase 3") of the Development (Tower 1, Tower 7, Tower 8 and Tower 9 of the residential development in Phase 3 are called "Wetland Seasons Park")|District: Tin Shui Wai|Name of the Street and the Street Number of Phase 1, Phase 2 and Phase 3 of the Development: 9 Wetland Park Road|The website address designated by the Vendor for Phase 1 of the Development: www.wetlandseasonspark.com.hk|The website address designated by the Vendor for Phase 2 of the Development: www.wetlandseasonspark2.com.hk|The website address designated by the Vendor for Phase 3 of the Development: www.wetlandseasonspark3.com.hk|Enquiries: (852) 3119 0008

The photographs, images, drawings or sketches shown in this advertisement/promotional material represent an artist's impression of the development concerned only. They are not drawn to scale and/or may have been edited and processed with computerized imaging techniques. Prospective purchasers should make reference to the sales brochure for details of the development. The Vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby.

Vendor: Pacific Gold Limited|Holding companies of the Vendor: Newray Ventures Limited, Time Effort Limited, Sun Hung Kai Properties Limited|Authorized Person for Phase 1, Phase 2 and Phase 3 of the Development: Ronald P.C. Liang|The firm or corporation of which the Authorized Person for Phase 1, Phase 2 and Phase 3 of the Development is a proprietor, director or employee in his professional capacity: LWK & Partners (HK) Limited|Building contractor for Phase 1, Phase 2 and Phase 3 of the Development: Chun Fai Construction Company Limited|The firms of solicitors acting for the owner in relation to the sale of residential properties in Phase 1, Phase 2 and Phase 3 of the Development: Woo Kwan Lee & Lo; Sit, Fung, Kwong & Shum; Mayer Brown|Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of Phase 1, Phase 2 and Phase 3 of the Development: The Hongkong and Shanghai Banking Corporation Limited|Any other person who has made a loan for the construction of Phase 1, Phase 2 and Phase 3 of the Development: Sun Hung Kai Properties Holding Investment Limited|The estimated material date for Phase 3 of the Development as provided by the Authorized Person for Phase 3 of the Development to the best of the Vendor's knowledge: 30 November 2021 ("Material date" means the date on which the conditions of the land grant are complied with in respect of Phase 3 of the Development. The estimated material date is subject to any extension of time that is permitted under the agreement for sale and purchase.)|Prospective purchasers are advised to refer to the sales brochure for any information on the Development or Phase 1, Phase 2 and Phase 3 of the Development.|This advertisement is published by the Vendor or by another person with the consent of the Vendor.|Date of Printing: 19 August 2021

Residents can enjoy panoramic views of the natural scenery of Wetland Park at the sky clubhouse, Sky Club (Notes 1&5)